Document details

Planning CCS development in the West Mediterranean

Author(s): Boavida, Dulce cv logo 1 ; Carneiro, Júlio cv logo 2 ; Martinez, Roberto cv logo 3 ; Van den Broek, Machteld cv logo 4 ; Ramirez, Andrea cv logo 5 ; Rimi, Abdelkrim cv logo 6 ; Tosato, GianCarlo cv logo 7 ; Gastine, Marie cv logo 8

Date: 2013

Persistent ID: http://hdl.handle.net/10400.9/2109

Origin: Repositório do LNEG

Subject(s): Carbon dioxide; Transport; Portugal; Spain; Morocco


Description
Transport and storage of CO2 are the elements in the CCS chain with the lowest cost, but they may well prove to be the elements defining the timeline for CCS development. The EU FP7 COMET project aimed to pave the road towards CCS development in the West Mediterranean (Portugal, Spain and Morocco). This paper provides the main highlights of the work conducted within COMET. The project addressed the temporal and spatial aspects of the development of the energy sector and other industrial activities in relation with CCS and its participation to CO2 emission reduction taking into account location, capacity and availability of CO2 sources and of potential CO2 storage formations. Special attention was given to a balanced optimization on transport modes, matching the sources and sinks, meeting optimal cost-benefit trade-offs, for a CCS network infrastructure as part of an international cooperation policy.
Document Type Article
Language English
delicious logo  facebook logo  linkedin logo  twitter logo 
degois logo
mendeley logo

Related documents



    Financiadores do RCAAP

Fundação para a Ciência e a Tecnologia Universidade do Minho   Governo Português Ministério da Educação e Ciência Programa Operacional da Sociedade do Conhecimento EU