This paper briefly illustrates a method to represent national energy systems and the geographical details of CCS infrastructures in the same technical-economic model. In the MARKAL-TIMES modeling framework a model of Morocco, Portugal and Spain with both spatial and temporal details has been implemented. As a function of assumptions on the development to 2050 of mitigation levels, economic growth and CO2 captur...
Transport and storage of CO2 are the elements in the CCS chain with the lowest cost, but they may well prove to be the elements defining the timeline for CCS development. The EU FP7 COMET project aimed to pave the road towards CCS development in the West Mediterranean (Portugal, Spain and Morocco). This paper provides the main highlights of the work conducted within COMET. The project addressed the temporal and...
This paper presents results of potential CCS infrastructures in the West Mediterranean region including trajectories for CO2 pipelines. The preliminary results are generated with a combination of geographical (GIS) and partial equilibrium optimization modelling (MARKAL/TIMES-COMET). Furthermore, as a result of active stakeholder involvement in the research project, the CCS infrastructures were critically review...
Financiadores do RCAAP | |||||||
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |