Detalhes do Documento

Control charts: a cost-optimization approach for processes with random shifts

Autor(es): Zempléni, András cv logo 1 ; Véber, Miklós cv logo 2 ; Duarte, Belmiro cv logo 3 ; Saraiva, Pedro cv logo 4

Data: 2004

Identificador Persistente: http://hdl.handle.net/10316/8188

Origem: Estudo Geral - Universidade de Coimbra


Descrição
In this paper we describe an approach for establishing control limits and sampling times which derives from economic performance criteria and a model for random shifts. The total cost related to both production and control is calculated, based on cost estimates for false alarms, for not identifying a true out of control situation, and for obtaining a data record through sampling. We describe the complete process for applying the method and compare with conventional procedures to real data from a Portuguese pulp and paper industrial plant. It turns out that substantial cost-reductions may be obtained. Copyright © 2004 John Wiley & Sons, Ltd. http://dx.doi.org/10.1002/asmb.521
Tipo de Documento Artigo
Idioma Inglês
delicious logo  facebook logo  linkedin logo  twitter logo 
degois logo
mendeley logo

Documentos Relacionados



    Financiadores do RCAAP

Fundação para a Ciência e a Tecnologia Universidade do Minho   Governo Português Ministério da Educação e Ciência Programa Operacional da Sociedade do Conhecimento União Europeia