This paper evaluates various aspects of flexibility in power systems worldwide within the multi-country study framework of IEA Wind Task 25, including grid components and actions which have been favoured for enhancing flexibility in different areas/countries/regions, and how TSOs/ISOs/ utilities intend to manage variable generation in their operating strategies. One methodology to evaluate the diversity of flex...
This paper provides an overview ofmajor transmission planning activities related to wind integration studies in the United States and Europe. Transmission planning for energy resources is different from planning for capacity resources. Those differences are explained, and illustrated with examples from several regions of the United States and Europe. Transmission planning for wind is becoming an iterative proce...
There are dozens of studies made and ongoing related to wind integration. However, the results are not easy to compare. IEA WIND R&D Task 25 on ‘Design and Operation of Power Systems with Large Amounts of Wind Power’ collects and shares information on wind generation impacts on power systems, with analyses and guidelines on methodologies. In the state-of-the-art report (October, 2007), and the fi nal report o...
There are already several power systems coping with large amounts of wind power. High penetration of wind power has impacts that have to be managed through proper plant interconnection, integration, transmission planning, and system and market operations. This report is a summary of case studies addressing concerns about the impact of wind power s variability and uncertainty on power system reliability and cost...
High penetration of wind power has impacts that have to be managed through proper plant interconnection, integration, transmission planning, and system and market operations. This report is a summary of case studies addressing concerns about the impact of wind powers variability and uncertainty on power system reliability and costs. The case studies summarized in this report are not easy to compare due to diffe...