Document details

Numerical approaches in a problem of management of hydroelectric resources

Author(s): Bushenkov, V. A. cv logo 1 ; Ferreira, M. M. A. cv logo 2 ; Ribeiro, A. F. cv logo 3 ; Smirnov, Georgi cv logo 4

Date: 2013

Persistent ID: http://hdl.handle.net/1822/27693

Origin: RepositóriUM - Universidade do Minho


Description
In this paper we consider a simpli ed model for a system of hydro-electric power stations with reversible turbines. The objective of our work is to obtain the optimal pro t of power production satisfying restric- tions on the water level in the reservoirs. Two di erent numerical approaches are applied and compared. These approaches centers on a global optimization technique (Chen-Burer algorithm) and on a Projection Estimation Re nement method (Bushenkov' PER method) used to reduce the dimension of the problem.
Document Type Article
Language English
delicious logo  facebook logo  linkedin logo  twitter logo 
degois logo
mendeley logo

Related documents



    Financiadores do RCAAP

Fundação para a Ciência e a Tecnologia Universidade do Minho   Governo Português Ministério da Educação e Ciência Programa Operacional da Sociedade do Conhecimento EU