Detalhes do Documento

An industrial application of the SMED methodology and other lean production tools

Autor(es): Costa, Eric Simão Macieira da cv logo 1 ; Sousa, Rui M. cv logo 2 ; Bragança, Sara cv logo 3 ; Alves, Anabela Carvalho cv logo 4

Data: 2013

Identificador Persistente: http://hdl.handle.net/1822/25314

Origem: RepositóriUM - Universidade do Minho

Assunto(s): Lean production; Lean tools; Setup process; SMED; Eco-efficiency


Descrição
This paper describes the improvement of the setup process of a mechanical press machine in the metal-mechanic area of an elevators company. The work results from a master thesisc project conducted during a period of five months. The Single-Minute Exchange of Die (SMED) methodology and other Lean Production tools (5S, Visual Management and Standard Work) were applied to reduce the setup times observed at the beginning of the project. With the developed solutions it was possible to reduce setup times, work-in-process (WIP) and distances travelled by operators. Additionally, the setup operations were standardized and consequently the process has become more fast and intuitive for the operators. These improvements allowed the reduction of energy and materials consumption and, consequently, a decrease on the Greenhouse Gases’ emissions.
Tipo de Documento Artigo
Idioma Inglês
delicious logo  facebook logo  linkedin logo  twitter logo 
degois logo
mendeley logo

Documentos Relacionados



    Financiadores do RCAAP

Fundação para a Ciência e a Tecnologia Universidade do Minho   Governo Português Ministério da Educação e Ciência Programa Operacional da Sociedade do Conhecimento União Europeia