Document details

Short-term scheduling model for a wind-hydro-thermal electricity system

Author(s): Pereira, Sérgio cv logo 1 ; Ferreira, Paula Varandas cv logo 2 ; Vaz, A. Ismael F. cv logo 3

Date: 2012

Persistent ID: http://hdl.handle.net/1822/21679

Origin: RepositóriUM - Universidade do Minho

Subject(s): Electricity planning; Unit commitment problem; Electricity system analysis


Description
This study addresses the problem of the self-scheduling of an electricity system mainly based on hydro, fossil fuel thermal and wind power plants. A binary mixed integer non-linear optimization model is described and applied to short-term electricity planning of a system close to the expected Portuguese one on the year 2020. The model is written in a GAMS code and a global optimization solver is used to obtain the numerical results. The objective function encompasses the minimization of total system production costs through a centralized unit commitment. Different constraints, essentially related to operating parameters that characterize the power plants available for dispatch, are included in the model. The obtained results show the importance of the renewable energy sources seasonality on the thermal power plants operating conditions and on the total cost of the system.
Document Type Conference Object
Language English
delicious logo  facebook logo  linkedin logo  twitter logo 
degois logo
mendeley logo

Related documents



    Financiadores do RCAAP

Fundação para a Ciência e a Tecnologia Universidade do Minho   Governo Português Ministério da Educação e Ciência Programa Operacional da Sociedade do Conhecimento EU