Author(s):
Oliveira, Sérgio ; Oliveira, José A.
; Dias, Luís M. S.
; Pereira, Guilherme
Date: 2011
Persistent ID: http://hdl.handle.net/1822/15451
Origin: RepositóriUM - Universidade do Minho
Subject(s): Modeling; Simulation; Scheduling; Heuristics; Optimization; Arena