Document details

Multiple Machine Continuous Setup Lotsizing with Sequence-dependent Setups

Author(s): Bernardo Almada-Lobo cv logo 1 ; Diego Klabjan cv logo 2 ; Maria Antónia Carravilla cv logo 3 ; José F. Oliveira cv logo 4

Date: 2010

Persistent ID: http://hdl.handle.net/10216/6961

Origin: Repositório Aberto da Universidade do Porto

Subject(s): Ciências Tecnológicas; Engenharia; Engenharia industrial


Description
We address the short-term production planning and scheduling problem coming from the glass container industry. A furnace melts the glass that is distributed to a set of parallel molding machines. Both furnace and machine idleness are not allowed. The resulting multi-machine multi-item continuous setup lotsizing problem with a common resource has sequence-dependent setup times and costs. Production losses are penalized in the objective function since we deal with a capital intensive industry. We present two mixed integer programming formulations for this problem, which are reduced to a network flow type problem. The two formulations are improved by adding valid inequalities that lead to good lower bounds. We rely on a Lagrangian decomposition based heuristic for generating good feasible solutions. We report computational experiments for randomly generated instances and for real-life data on the aforementioned problem, as well as on a discrete lotsizing and scheduling version.
Document Type Article
Language English
delicious logo  facebook logo  linkedin logo  twitter logo 
degois logo
mendeley logo

Related documents



    Financiadores do RCAAP

Fundação para a Ciência e a Tecnologia Universidade do Minho   Governo Português Ministério da Educação e Ciência Programa Operacional da Sociedade do Conhecimento EU