Detalhes do Documento

Lead time considerations for the multi-level capacitated lot-sizing problem

Autor(es): Christian Almeder cv logo 1 ; Diego Klabjan cv logo 2 ; B. Almada-Lobo cv logo 3

Data: 2009

Identificador Persistente: http://hdl.handle.net/10216/15850

Origem: Repositório Aberto da Universidade do Porto

Assunto(s): Ciências Físicas; Ciência de computadores; Programação, Ciências tecnológicas; Engenharia; Engenharia industrial


Descrição
The classical multi-level capacitated lot-sizing problem is often not suitable to correctly capture resource requirements and precedence relations. We tackle this issue by explicitly modeling these two aspects. Two models are presented; one considering batch production and the other one allowing lot-streaming. Comparisons with traditional models demonstrate the capability of the new approach to deliver more realistic and practically feasible results. Large-scale cases are solved by Benders, which has been enhanced in several novel ways.
Tipo de Documento Relatório
Idioma Português
delicious logo  facebook logo  linkedin logo  twitter logo 
degois logo
mendeley logo

Documentos Relacionados



    Financiadores do RCAAP

Fundação para a Ciência e a Tecnologia Universidade do Minho   Governo Português Ministério da Educação e Ciência Programa Operacional da Sociedade do Conhecimento União Europeia