Detalhes do Documento

Investment optimization in distribution network based on fuzzy outage parameters

Autor(es): Canizes, Bruno cv logo 1 ; Soares, João cv logo 2 ; Vale, Zita cv logo 3 ; Khodr, H. M. cv logo 4

Data: 2012

Identificador Persistente: http://hdl.handle.net/10400.22/1303

Origem: Repositório Científico do Instituto Politécnico do Porto

Assunto(s): Investment optimization; Fuzzy outage parameters


Descrição
This paper presents a methodology that aims to increase the probability of delivering power to any load point of the electrical distribution system by identifying new investments in distribution components. The methodology is based on statistical failure and repair data of the distribution power system components and it uses fuzzy-probabilistic modelling for system component outage parameters. Fuzzy membership functions of system component outage parameters are obtained by statistical records. A mixed integer non-linear optimization technique is developed to identify adequate investments in distribution networks components that allow increasing the availability level for any customer in the distribution system at minimum cost for the system operator. To illustrate the application of the proposed methodology, the paper includes a case study that considers a real distribution network.
Tipo de Documento Documento de conferência
Idioma Inglês
delicious logo  facebook logo  linkedin logo  twitter logo 
degois logo
mendeley logo

Documentos Relacionados



    Financiadores do RCAAP

Fundação para a Ciência e a Tecnologia Universidade do Minho   Governo Português Ministério da Educação e Ciência Programa Operacional da Sociedade do Conhecimento União Europeia