Detalhes do Documento

Optimizing the profit from a complex cascade of hydroelectric stations with reci...

Autor(es): Korobeinikov, Andrei cv logo 1 ; Kovacec, Alexander cv logo 2 ; McGuinness, Mark cv logo 3 ; Pascoal, Marta cv logo 4 ; Pereira, Ana cv logo 5 ; Vilela, Sónia cv logo 6

Data: 2010

Identificador Persistente: http://hdl.handle.net/10316/14423

Origem: Estudo Geral - Universidade de Coimbra

Assunto(s): Optimization; Hydroelectric power; Branched cascade; Reversible turbines; Case study


Descrição
In modern reversible hydroelectric power stations it is possible to reverse the turbine and pump water up from a downstream reservoir to an upstream one. This allows the use of the same volume of water repeatedly and was specifically developed for hydro-electric stations operating with insufficient water supply. Pumping water upstream is usually done at times of low demand for electricity, to build up reserves in order to be able to produce energy during peak hours, thus balancing the load and making a profit on the price difference. In this paper, we consider a branched model for hydroelectric power stations interacting in a complex cascade arrangement. The goal of this study is to provide guidance in decision-making aimed at maximizing the profit. A detailed analysis is made of a simpler reservoir configuration, which indicates that even though the problem is nonlinear, a bang-bang type of control is optimal, where the power stations are operated at maximum rates of flow. Some simple relation- ships between price and timing of decisions are calculated directly. A numerical algorithm is also developed.
Tipo de Documento Artigo
Idioma Inglês
delicious logo  facebook logo  linkedin logo  twitter logo 
degois logo
mendeley logo

Documentos Relacionados



    Financiadores do RCAAP

Fundação para a Ciência e a Tecnologia Universidade do Minho   Governo Português Ministério da Educação e Ciência Programa Operacional da Sociedade do Conhecimento União Europeia